City Licenses, Permits, and Forms

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Online Permit Applications

The City of Quincy has partnered with iWorQ to bring online permit applications and code enforcement reporting tools to residents and customers doing business with the City of Quincy's Planning & Development Department. With iWorQ, residents and customers can submit permit applications and code enforcement violations, schedule inspections and view results, pay applicable fees, and search for permit and code enforcement data, all from the convenience of their home, business, or mobile device.

The iWorQ portal can be accessed from the following links:

iWorQ Permits
iWorQ Code Enforcement

To view a specific permit application or form, please use the Online Application link from the following table. Residents and customers wishing to complete and submit a paper form should use the PDF Application link.

Building Permit
Online Application
PDF Application
Demolition Permit
Online Application  PDF Application 
Electrical Permit
Online Application  PDF Application 
Fence Permit
Online Application  PDF Application 
Plumbing Permit
Online Application  PDF Application 
Pool Permit
Online Application  PDF Application 
Sign Permit
Online Application  PDF Application 
     
Minimum Housing Complaint Form
Online Application
PDF Application

Other Permit and License Applications

The following permit and license applications are not available to be submitted online. Please select the desired application to view more information regarding the application process, and to access a downloadable or fillable PDF application document.

Floodway Permit

  • Departments:Engineering
  • Categories:City Permits
  • Phone:(217) 228-4527

A Floodway Permit is required prior to any development within a designated floodplain.  Development is defined as any man-made change to real estate including grading, filling, utility installation, building construction and fence installation. The floodways are located adjacent to the Mississippi River, Cedar, Emery and Curtis Creeks and their tributaries.

Floodway Permits can be issued for certain developments only if the new development will not increase the flood potential for adjacent property owners.

Requirements:  All construction within a floodplain must be constructed to withstand the 100-Year Flood.  Certain developments will also require permits from the Corp of Engineers, the Department of Water Resources of the Illinois Department of Transportation and the Environmental Protection Agency prior to the issuance of the Floodway Permit.  Developments adjacent to the floodplain may require an Elevation Certificate verifying that a development is located above the 100-Year Flood Elevation.

Application:  Floodway Permits can be obtained from the Engineering Department located on the 2nd floor at City Hall, 730 Maine Street. 

Fee:  No fee

For additional information, please contact the Engineering Department at (217)228-4527.

For More Information:
Jeffrey Conte, City Engineer
City Hall, 730 Maine 
Quincy, Illinois  6230l 
217-228-4527
engineering@quincyil.gov

Return to full list >>